Blocks on Summary page | Configuration information and options | ||||
---|---|---|---|---|---|
Order block | • Options to configure Details fields. • Non-configurable Details action. This action allows app users to further drill down to the Orders details page and specific blocks. | ||||
Work assignment block | • Options to configure Details fields. • Non-configurable Details action. This action allows app users to further drill down to the Work assignments details page and specific blocks. | ||||
Health & safety block | • Option to show or hide this block. • Non-configurable Details action. This action allows app users to further drill down to the Health & safety details page and specific blocks for: Permits, Activity types, Hazards, Method statements and Risk assessments. • Each of these blocks can give access to details pages with configuration options, for example for Documents, Images, Activity types or Hazards logs (Hazards details page). | ||||
Location block | • Options to configure Details fields. • Configurable Get directions action. Field engineers can use this action to open a device native ‘Map application’ to get directions to the specified location, based on the longitude/latitude, or on address information.
| ||||
Asset block | • Configurable Add, Change, View BIM model(s) and Confirm asset actions, to allow app users to add and edit asset information and give them the possibility to check if they are working on the right asset or not. • On the Asset details page > Actions tab, you can configure the visibility and labels of additional asset actions, such as Unlink asset and View all related orders. When users navigate to the Asset details page, they can access these actions. See also: Adding / changing / confirming an asset. | ||||
Meters block | Additional Add meter reading action, to enable adding Meter readings.
| ||||
Observations block | Option to display observations for assets, spaces or properties. App users can also add new observations for assets, spaces and properties via this block. There is a navigation link between this Observations block and the Mobile observations app module, provided you have configured both on the app. When navigating from this Observations to Mobile observations, the order / maintenance activity reference is passed to the newly registered observations. See Observation fields. | ||||
SLA block (non-PPM orders only | Option to display the Temporary fix and continue action). | ||||
Materials block | Activate the setting Display order lines to enable ordering materials without using the Planon Products catalog. With the order lines setting activated, app users can order materials by adding new order lines or edit existing order lines. Activate the setting Display requisition lines if you want to enable requesting materials from the Planon Products catalog. The requisition lines functionality becomes available on the app. You must enable at least one of these two settings, but you can enable both. If you enable Display requisition lines, also refer to
PMFS solution
- Materials module configuration for more information on configuring the complementary Materials app module. Good to know: App users will also be able to add requisition lines without selecting a product from the product list (non-product requisition lines), in case the materials they need are not listed. See Configuring Add, Edit and Delete actions for requisition lines for the configuration of Add, Edit and Delete actions. | ||||
Questionnaire block | Option to display work-related questionnaires in a separate block on the Summary page. After starting work, app users can open the questionnaire(s) here and complete the form as they progress with the work. If the questionnaire contains mandatory questions, this is clearly indicated on the app. Some questions included might be mandatory on completion of the work. App users must answer these questions to be able to set the work assignment to Done. For information on configuring work-related questionnaires in the Summary page see: Defining a scope for work-related questionnaires (Planon app PMFS solution ). In this procedure, it is also explained how to configure the display of work-related questionnaires upon status changes. | ||||
Communication logs block | Option to display communications logs (Comments, Images and Documents) added to the order. Good to know: for PPM-based work assignments, maintenance activity-related communication logs can be configured on the Maintenance activity page. See Configuring the Maintenance activity page. | ||||
Labor hours block | Displayed on the app under Time spent, distinguishing between various types of labor hours such as Travel, Work and Wait). You can also configure options for the Edit labor hours and Add labor hours pages and blocks. See below.
The app displays running labor hours, so the Time spent block on the app is updated with each status transition.
| ||||
Related orders block | Option to display blocks with related orders that were Last reported, Last completed and Next planned for the asset from the order that the engineer is currently working on. | ||||
Checklist items block (PPM orders only) | Option to display the checklist items for a PPM based work assignment. |
![]() | If the sub web definition is linked to a planned maintenance order, start with configuring the Maintenance activities page and its blocks / the Maintenance activity page and then proceed with their respective Details pages and blocks. See: Configuring the Maintenance activities page, Configuring the Maintenance activity page and Configuring details pages and blocks (PPM orders). |
![]() | The Labor hours details page also includes an Edit labor hours details page and block and an Add labor hours details page and block, where you can configure labor hour related fields that you want to be available for editing or adding on the app. Internal tradesperson, Start date-time, End date-time and Hour type are default fields that cannot be removed. These editing options are available on the app for work assignments in the Travel, Work and Wait statuses. For information on configuring the registration of labor hours for external workers see Configuring external labor hour registration. |