Linking workspace(s) using the split action
To add workspace(s) to a neighborhood using the
Split action, proceed as follows:
Procedure
1. Go to Workspaces & space data > Workspaces.
2. Select the workspace(s) that you want to link the neighborhood.
| If you want to perform an action on multiple workspaces simultaneously, you can use Action on selection. |
| The start date of the selected workspace(s) must be equal to or later than the start date of the neighborhood. If the workspace(s) start date is earlier than the neighborhood start date, the new workspace(s) is created by using split action. |
3. Go to Workspaces details.
4. On the action panel, click Split.
The Enter values dialog box appears.
5. By default, the reference date is selected in the Split date field. To select another date, click Select a date button and select the required date in the date picker on which the modification is to become effective. Click OK.
A new workspace is created with the latest Start date.
6. Select a neighborhood in the Neighborhood field and modify the required Workspace details field(s).
For more information on workspace details fields(s), see
Workspace details fields (Spaces and workspaces).
7. Click Save.
The Question dialog box appears.
8. Select Yes, if you want to change this space to a shared space or select No and click Proceed.
The workspace(s) is/are linked to a neighborhood.