The above settings apply to Planon AppSuite only and not to other Planon mobile solutions. Option E - Last minute risk assessment can only be used for Planon AppSuite's EHS wizard and is presented in the EHS check before the engineer starts or resumes a job. You can configure so-called blocking answer options on multiple choice questions in the questionnaire. Blocking answers will prevent engineers from starting the job for their own safety, because a failing EHS check means they can only reject the job. It is also possible to configure mandatory questions for the field engineers. The LMRA answers are stored in the Work Orders TSI at Order details. |
For more information on working with questionnaires, see the Questionnaires documentation. |
The maximum height of the Sign-off box (image) is limited to 10,500 pixels. If a job's Sign-off box contains many details, such as lengthy questionnaires, large numbers of activities, materials or labor hours, these may exceed the Sign-off image limit. As a consequence, the system will omit most of these details from the Sign-off image. However, basic job information and signature is always included in the sign-off image. Large comments will be limited to 2,000 characters. |