Adding a hazard log
You can add a hazard log based on an assessment method. There are four types of assessments available:
Asbestos assessment based on HSG264 (asbestos assessment)
Risk assessment based on a risk matrix (risk assessment)
Calculating the risk level based on a score (basic hazard log)
Selecting a risk level manually (basic hazard log)
Procedure
1. Go to Hazard registry > Hazard logs.
2. On the action panel, click to add any one of the assessments given below:
Add asbestos assessment
Add risk assessment
Add basic hazard log
3. Complete the fields on the data panel.
For information on these fields, see Hazard log fields.
4. Click Save.