Core TSIs : Work assignments : Configuring work assignments TSIs and layouts
Configuring work assignments TSIs and layouts
The following configurations steps are recommended for both 1:1 planning and 1:n planning, so it does not matter whether or not you have activated the feature switches and license check for multiple work assignments.
Procedure
1. Add a selection step in Orders.
a. In TSIs select Orders.
b. Set the Orders TSI under construction.
c. Go to the TSIs level and expand the TSI.
d. Select Order details and add the selection step Work assignments.
e. Return to All TSIs and set the TSI to completed.
2. Optionally, add a selection step in Personnel.
a. In TSIs select Personnel.
b. Set the Personnel TSI under construction.
c. Go to the TSIs level and expand the TSI.
d. Select Details and add the selection step Work assignments.
e. Return to All TSIs and set the TSI to completed.
3. Go to Layouts.
4. Select the Work assignments layout and put it under construction by clicking the padlock icon.
All fields are available on the layout.
5. Configure the layout according to your requirements (reposition fields, add bars etc.).
* 
See Layouts for more information on configuring layouts.
6. Set the layout to Completed.
7. Log out and log in again.