Survey status
The extent to which a survey has been carried out.
In Surveys TSI, you can assign various statuses to a survey:
• In preparation
• In progress – checked out
• In progress – in Planon
• Ready for tuning
• Ready for processing
• Processed. This final status cannot be selected. It is assigned automatically after the Process survey data action is completed.
These statuses are selected at the Surveys selection level > Status transitions action menu. The In progress – checked out status is assigned to a survey whose survey data is exported to an external surveying tool. To use the action Process survey data a survey must be set to the status Ready for processing.
| To make a status transition to Ready for processing the Observed condition before maintenance field at Survey elements must be populated. |
| If a survey is in the Ready for processing, Processed, or In progress – checked out status, the data of the survey is read-only in Planon ProCenter. |