Property details data
Field
Description
General fields
Start date
Enter the start date for the property.
End date
Enter the end date for the property.
Code
Enter a code for the property.
Property
Select a property from the list. If you drill down from a property, this field will be filled in automatically.
Approval definition
The approval definition linked to the property.
Current portfolio data
Portfolio strategy
Select the strategical status of the property. You can choose from the following options:
Hold
Dispose
Refurbish
Redevelop
Tenure
Select the conditions under which land or buildings are held or occupied. You can choose from the following options:
Sole ownership
Joint ownership
Leased
Business strategic value
Select the value that the property is likely to generate. You can choose from the following options:
High
Low
Medium
Marketability
Select weather the property is Marketable or Non-marketable.
Footprint areas
Property footprint area
Enter the ratio of a building's total floor area to the size of the piece of land upon which it is built.
Area surfaced
Enter the part of property that is properly surfaced.
Area unsurfaced
Enter the part of property that does not have proper surface or durable upper layer.
Water expanse
Enter the extent of water on the property.
Rentable area
Enter the area of the property which may be leased or rented to tenants.
Energy index
The energy index expresses the energy efficiency of a building in a number. Enter a numerical value in this field.
Energy index expiration date
Enter the date on which the energy index expires. On this date, the energy index must be redetermined.
Energy label
Select a relevant energy label from the Energy label dialog box that is available in this field. Energy labels are maintained and added in Supporting data . For more information, see Energy labels.
Energy label expiration date
Enter the date on which the energy label expires. On this date, the energy label must be redetermined.
EP-2
The EP-2 indicates the primary fossil energy consumption. Enter the EP-2 as a numerical value in this field.
EP-2 expiration date
Enter the date on which the EP-2 expires. On this date, the EP-2 must be redetermined.