Field | Description |
---|---|
Standard cost type | Selected mapped Cost type in the External mapping to SAP Expense types. For Reservation costs, this is only allowed to be changed on Order line level. |
Description | If it's Reservation costs, the Description is automatically generated as ‘Total costs reservation’. When the Reservation is cancelled, the description is changed to ‘Total cancellation costs’. For Manually entered costs, free to use a description. |
Cost excluding VAT | The sum of both the ‘Material Cost’ and ‘Hour Costs’ if they are required to be combined. Typically, just Material Cost should be used. Should not be zero or negative. Convert in the right currency when the original currency of the amount is different from the company code currency. |