Core TSIs : Assets : Asset maintenance (Maintenance planner) : Linking standard / contract service plans to an asset or building element
Linking standard / contract service plans to an asset or building element
Procedure
1. At the Assets selection level, select the asset / building element to which you want to link standard / contract service plans.
2. In the Links action panel, click Link standard service plans / Link contract service plans.
The Link standard service plans / Link contract service plans dialog box appears.
In Available, select the standard / contract service plan(s) you want to link to the selected asset/building element.
* 
If the list of service plans shown in Available is very long, use the dialog's filtering options to locate the relevant service plan(s).
3. Click the right arrow button to transfer the selected service plans to In use.
4. Click OK.
The standard / contract service plans are now linked to the selected asset / building element.