Field | Description | ||
---|---|---|---|
Asset/building element | Enter the relevant asset or building element whose condition data are added. | ||
Survey date | Enter the date on which the condition of the selected asset or building element is observed. If the condition data is based on processed survey data from > this field is populated automatically.
| ||
Aggregated risk score | This calculated read-only field displays the weighted average taken from all aggregated risk scores and quantities that are available at Condition details for a selected asset or building element. Example A survey is processed on 1 March 2015; 2 condition details are added to an asset’s condition data: Asset condition detail 1: Quantity = 110 Aggregated risk score = 4 Asset condition detail 2: Quantity = 100 Aggregated risk score = 2 On 1 March 2015, the aggregated risk score of the asset amounts to: (110 * 4) + (100* 2) = 640 640/210 = 3.05 | ||
Aggregated condition score | Displays the weighted average taken from the sum of observed conditions that are available at Condition details for a selected asset or building element. The value is taken over from the corresponding survey elements after a survey is processed in Condition Surveys. Example Building element = brick wall. Total quantity (m2) = 90 Required condition = 1 10 m2 of the wall is in observed condition 2 70 m2 of the wall is in observed condition 1 10 m2 of the wall is in observed condition 4. Obviously, the largest part of the wall is in the required condition, so that must carry the most weight in the calculation: The wall’s Aggregated condition score is calculated according to this formula: ((10*2) + (70*1) + (10*4) ) / 90 = 1.44 Since the wall’s Required condition is 1, maintenance is not very urgent.
| ||
Code | Enter a code for the condition data. | ||
Description | Enter a description of the condition data. | ||
Total quantity | This calculated, read-only field displays the sum of the quantities available for a selected asset/building element at Condition details. | ||
Latest condition update date-time | Displays the date of completion of a maintenance activity on the selected condition detail. |