Activity planning is predictive-based
A
predictive-based planning method is using an asset's consumption thresholds as a criterion for scheduling activities. Depending on the type of meter on the asset, this consumption can for example be measured in number of operational hours, kilometers, kilowatts, degrees Celsius etc.
You selected a predictive-based planning. The Predictive-based schedule dialog box appears:
Procedure
1. In the Counter field, select the counter that is linked to the asset of the activity definition.
2. In the Consumption threshold field, enter the threshold value at which planned activity scheduling must start.
3. Click OK.
Depending on the entered values, one or more planned activities are now scheduled for the selected activity definition.