Field | Description |
---|---|
Activity definition worker | |
Activity definition | Click the pick list button in this field to open the Activity definition dialog box in which you can select the required activity definition. |
Classname | Click the pick list button in this field to open the Select a value in the dialog box in which you can select the required class name (Copy replacement cost worker, Deterioration curve planning or Prediction bed planning) . |
Settings for Copy replacement cost worker | |
Description | Enter a relevant description for the copy replacement cost worker. |
Index % | Enter the index percentage (number) to be used for the copy replacement cost worker. |
Long-term indexation | Enter the long index percentage (number) to be used for the copy replacement cost worker. |
VAT / tax rate | Click the pick list button in this field to open the Tax rate dialog box in which you can select the required value. |
Settings for Condition-based planning (Deterioration curve planning) | |
Confirmation required | Select the option yes if you want to change the status of the moved planned activity to Confirmation required. By default, this field is set to No. |
Deterioration curve | Click the pick list button in this field to open the Tax rate dialog box in which you can select the required value. |
Topic | |
Settings for Prediction-based planning | |
Consumption thresholds | Enter a number to be used for the consumption thresholds |
Counter | Click the pick list button in this field to open the Counter dialog box in which you can select the required counter. |
Counter definition | Click the pick list button in this field to open the Counter definition dialog box in which you can select the required counter definition. |