Material handling
Material handling in Planon AppSuite is done via jobs that are based on a
Key work assignment. A field engineer allocated to a key work assignment can do the following:
• Update / edit planned materials
• Confirm received materials
• Return materials upon finishing the order
Planned materials of key jobs can only be edited by the main responsible engineer. However, the other engineers can add the materials they have used. Requesting or reserving materials is not dependent on the job being a key work assignment. If a mobile store is used, only the owner of the mobile store can edit the planned materials coming from that store.