Field | Description |
---|---|
Code | Enter a code for the Graduated layer lines. |
Start level | Specify a start level reading for which the unit cost is applied. For example, 1. |
Cost profile | Select a cost profile for which you want to create the Graduated layer lines. |
Amount excl. VAT | Specify a value in the Amount excl. VAT dialog box. This is the cost per unit as per this layer. |
End level | Specify an end level reading for which the unit cost is applied. For example, 100. (The range of this layer is 1 - 100.) If you leave this field empty, the entire meter reading will be charged with the unit price specified in Amount excl. VAT. |