Linking SWP periods to a project
The procedure for linking periods to a project is similar to that of linking a property/department.
Procedure
1. In Strategic Workplace Planning, go to the Scenario projects selection level.
2. Select the project for which you want to link SWP periods.
3. On the action panel, click Link SWP periods.
The Link SWP periods dialog box appears.
* 
The SWP periods displayed here are the periods that are linked to the project.
4. Select the SWP period(s) you want to link.
* 
You cannot link more than 8 SWP periods.
5. Click OK.
You have now linked a period.