Adding SWP periods
You can create SWP periods in the SWP periods TSI. These created SWP periods can be linked to the project.
Procedure
1. Go to SWP periods.
2. On the action panel, click Add.
3. On the data panel, enter the required information.
For information on the field descriptions, see
SWP period fields.
4. Click Save.
You have now added a SWP period.