Adjacency fields
Field
Description
SSP project
Enter the name of the corresponding SSP project. If you descended from a project, this field is already populated with the project information.
Department A
Enter the department for which you want to specify the adjacency to another department (specified in the Department B field). The combination of departments should be unique.
Department B
Enter the department for which you want to specify the adjacency to another department (specified in the Department A field).
Requirement value
The requirement value (1 to 9) is a factor that indicates whether departments/teams should be put closer together or further apart. Value 9: the adjacency of the two departments is very important. Value 1: the adjacency of the two departments is not important at all. If no values are specified, no adjacency calculations are possible.
Comments
Enter comments on the location, if required.