Snapshot scenario item
The comparison results retrieved after computing the scenario and baseline are displayed at the Snapshot scenario item selection step. The results are computed based on the comparison profile linked to the project. This data includes information about the spaces and assets found in Planon on the specified reference date.
In case of spaces, the changes are displayed per selected attribute (department, cost center, space type, space category, space standard, tariff group). In case of assets, the following information is displayed: the assets involved, the assets that have moved or changed and the way they are moved and the costs involved.
Warning  
The move of assets within spaces are not considered as a move to another place.