Apps : Planon app : PMFS : Work assignments overview page : Job list on 'Downloaded' tab - grouping and sorting
Job list on 'Downloaded' tab - grouping and sorting
The app's Landing page displays all work assignments that are assigned to you personally or as a team member, distributed over two tabs. The Assigned tab is an online overview of all work that is assigned to you. New, 'unopened' assignments are marked with a blue dot. Once you tap a work assignment to view it, it moves to the Downloaded tab and also becomes available for offline work situations.
The grouping and sorting criteria that are applied to the job list on the Downloaded tab require some explanation.
Sorting and grouping on Downloaded tab
On the Downloaded tab, your work assignments are grouped / sorted as follows:
1. At the top of the list you see the work In progress. This group includes jobs that you have already started, by selecting either Travel, Work, Wait or Pause on your mobile device.
Within this group, the work assignments are sorted based on the following criteria:
the date-time of the work assignment (nearest start date-time or requested completion date-time at the top),
* 
The type of date-time information that is displayed depends on your configuration. The displayed date-time can be an SLA related date-time of the related order, or the Planned start date-time of the work assignment.
For more information about configuring the date-times, see Linking user groups and configuring the Start page.
whether it is a high priority assignment or not,
order type (reactive assignments are ranked higher),
whether the assignment is a personal or a team assignment,
work assignment code.
In short: Work assignments that are high priority, reactive and personally assigned to a field engineer will get the highest ranking on the Downloaded tab. Non-reactive team assignments with a normal priority will be ranked lower.
2. The second group includes all the work you have Accepted, but not yet started.
Within this group the assignments are also sorted based on date-time, high priority, order type etc.
3. The third group includes work assignments that you have only downloaded (still in the Assigned status).
Screen capture of Downloaded tab with grouping