Assigning move lines to an existing move order
If you assign move lines of various move requests to an existing order, you basically copy these move lines. A read-only version of the move lines remains with the move request.
| Move lines can co-exist in both move requests and move orders. A move line linked to a move request cannot be deleted if it is linked to an order. However, a move line linked to a move order can be deleted. The move line in the request remains and with it the link to the occupancies. |
Procedure
1. At Details > Move lines, (multi-) select the move line(s) that you want to assign to a move order.
2. If you have selected a single move line, click Assign to move order on the action panel. or
If you have selected multiple move lines, click Action on selection:
3. In the Action on selection dialog box, click Assign to move order.
4. In the Question dialog box, click OK to proceed.
5. In the Order dialog box, select the move order to which you want to assign the move line(s).
6. Click OK to proceed.
The action (on selection) is performed. The move lines are now assigned to the selected move order.
If you want to assign move lines that are already assigned to a move order to another move order, you can follow the above procedure, but instead use Assign to different move order on the action panel.