Field | Description |
|---|---|
Controlled by external system? | Select whether meter readings are registered in Planon or in an external system. • Yes: Meter readings are registered outside Planon and should not be entered in Planon. • No: Meter readings are registered and maintained in Planon. At any given time, meter readings can be registered in only one system |
Operational? | Specify whether the meter is operational during the specified period. • Yes: Meter readings can be registered • No: Meter readings cannot be registered Use this field to temporarily or permanently disable meter readings. |
Meter | Select the meter for which you define the meter control context. |
Start date | Enter the date from which the meter control context settings apply. Each change in configuration creates a new record with its own start date. |
End date | Displays the date until which the meter control context is valid. This date is automatically determined by the system. |
Readings updated until | Displays the latest date up to which meter readings have been processed or updated. This field is typically used for integration or synchronization tracking purposes. |