Copying data from persons or assets to a space
You can copy department data and cost center data of persons or assets to the space they are located in.
Procedure
1. Select the Persons or Assets tab.
2. In the drawing, select the person(s) or the assets(s).
3. Click Copy to space.
4. The department and cost center values of the person(s) or asset(s) are now copied to the space.
* 
If the department or cost center is not similar for all the selected persons or assets, it is not copied to the space. Empty values are not considered.
* 
If your drawing contains unclosed polylines that represent Spaces, Rent to units or Rent from units, then the outcome of area calculations, available workspace calculations and copying data from and to spaces might be incorrect. We recommend that your drawing contains only closed polylines.