Reference date
In Spaces & Workspaces , a reference date can be set at various selection levels and steps to be able to retrieve specific time-dependent data. For the CAD Integrator functionality this means that the drawing (.orj file) to be displayed should belong to floor attributes that have a start date equal to or earlier than the reference date.
The reference date is set via the Reference date button in the Planon header button for Reference date. By default, the reference date is the current date and it is activated. Clicking Reference date opens a date picker, from which you can select another date that is in the past or in the future. Once a new reference date is selected, the color of the header button changes and it displays the selected date.