Building scenarios - fields
Field
Description
Attribute definition set
Variable field so that different standards can have their own specialized fields. Can be defined on the calculation method.
Bio-based
Read-only field, calculated by the app.
Bio-based materials?
Specify if bio-based materials are present in the building object of this scenario or not.
Bio-based recovery
Displays the percentage of bio-based recovery that applies to the building object (=process of reusing materials derived from renewable biological sources). Read-only field, calculated by the app.
Building Circularity Index /
Building Circularity Index (BP)
Enter the Building Circularity Index that applies to the building object of this scenario.
* 
BP= Building part
Building environmental impact
Enter the building environmental impact that applies to the building object of this scenario.
Building height
Enter the building height that applies to the building object of this scenario:
Low
Medium
High
Building object
Select the appropriate Building object from the list.
Calculation goal
Select the appropriate calculation goal from the list:
Measurement
Research
Tender
Certification
Subsidy
Material passport
Other
Unknown
Calculation method
Select the appropriate Calculation method from the list.
Calculation type
Select the appropriate calculation type from the list:
Low circular scenario
Average circular scenario
High circular scenario
Code
Enter a code for the scenario.
Comment
If relevant, enter comments to the building scenario.
Compostable
Specify the percentage of compostability of the building object in this scenario.
Construction-stored carbon (kg) / (tons)
Specify the amount (in kg / in tons) of carbon dioxide (CO2) that is present in the building object of this scenario.
Construction type
Indicate the construction type of the building object:
Concrete
Steel
Wood
Combination
Customer
Select the customer to which this scenario applies.
Date of delivery
Enter the date of delivery.
Development phase
Select the appropriate development phase from the list:
Definitive design
Realized
Initiative
Sketch design
Technical design
Final design
Preliminary design
Disassembly?
Specify if disassembly is involved in this scenario or not.
Disassembly potential /
Disassembly potential (BP)
Specify the Disassembly potential of the building object in this scenario.
* 
BP= Building part
Energy usage
Indicate the energy usage that applies to the building object of this scenario:
Nearly Energy Neutral Buildings
Energy Neutral Buildings
Zero-on-the-Meter
Other
Environmental Cost Index
Specify the Environmental Cost Index of the building object in this scenario.
Gross floor surface
Enter the gross floor surface of the building object in this scenario.
Gross usable surface
Enter the gross usable surface of the building object in this scenario.
GWP module A-D
Read-only field, calculated by the app.
GWP module A-D per m2 GFA
Read-only field, calculated by the app.
High quality recycling
Specify the percentage of high quality recycling of the building object in this scenario.
Incinerated
Specify the percentage of incineration of the building object in this scenario.
Landfill
Specify the percentage of landfill of the building object in this scenario.
Last calculation date
Automatically populated by Planon. Displays the date of the last calculation.
Lifespan
Enter the lifespan in years of the building object in this scenario.
Low environmental impact?
Specify if the building object of this scenario has a low environmental impact or not.
Mass kg
Enter the mass in kilograms of the building object in this scenario.
Material circularity index /
Material circularity index (BP)
Specify the Material circularity index of the building object in this scenario.
* 
BP= Building part
Method version
Displays the version of the calculation method. The value in this field is copied from the calculation method.
Name
Enter a name for the scenario.
New materials
Enter the amount of new materials in the building object of this scenario.
Number of calculated products
Automatically calculated and populated by Planon. Displays the number of calculated products in the scenario.
Object function
Select the appropriate object function from the list. The function of a building refers to its purpose or intended use. For example, Office, Shop, Warehouse.
Paris proof indicator
Enter the Paris Proof Indicator of the building object in this scenario.
Ready for verification?
Specify if the scenario can be verified or not. By default, this field is set to No.
Recycled materials?
Specify if recycled materials are involved in this scenario or not.
Reusable?
Specify if reusable materials are involved in this scenario or not.
Reused materials?
Specify if reused materials are involved in this scenario or not.
Total products in scenario
Automatically calculated and populated by Planon. Displays the total number of products in the scenario.
Type of project
Indicate the type of project:
New construction
Existing construction
Renovation
Maintenance
Sustainable renovation
Verification date
Enter the date on which the scenario was verified.
Verified by
Select the person who verified the scenario from the list.
Waste (kg)
Enter the amount of waste in kilograms of the building object in this scenario.