Core TSIs : Agile Workplace Management : Data engine : Statuses : Switching status manually
Switching status manually
In Planon Software Suite, the connector and the measurement point (system) statuses can be changed manually.
* 
Note that this status differs from the occupancy status.
Action
Result
Switching the connector to inactive
All related measurement points that are in the Active status will be switched to occupancy status Pause. Communication between the data engine and the sensoring system is not possible.
Switching the connector to active
All related measurement points that are in occupancy status Pause will be switched to the actual occupancy status (occupied/unoccupied) following the next reading cycle.
Switching the measurement point to inactive
The measurement point occupancy status will be switched Inactive.
Switching the measurement point to active
The measurement point occupancy status is switched to Pause and will be set to the actual occupancy status following the next reading cycle.