Field | Description | ||
---|---|---|---|
Scheduling method | Click the Select a value button in this field to open the Scheduling method dialog box. Select a scheduling method. | ||
Activity definition | Displays the activity definition to which the planning details apply. | ||
Schedule | Click the Select a value button in this field to open the Schedule dialog box. Select the scheduling type. | ||
Standard planning details | Indicates the standard planning detail used to create the current planning detail (when applying a Standard activity definition). This link can be edited if you want to break the connection to the standard and prevent future updates from the library from affecting this record. If needed, the field can be set to read-only in the Field definer. | ||
Start date-time | Enter a start date-time for the planning details. | ||
End date-time | Enter an end date-time for the planning details. | ||
| |||
Lower limit | Defines how far in advance a planned activity can be rescheduled. For example, if set to 2 months, the activity can be moved up to 2 months earlier than its generated date. | ||
Upper limit | Defines how far after the generated date a planned activity can be rescheduled. For example, if set to 2 months, the activity can be moved up to 2 months later than its generated date. |